Ka-56 Portable Helicopter

IT, Science & Technology, Space sciences News and other related news
Post Reply
User avatar
moonjee06
Extreme Contributor
Extreme Contributor
Posts: 3162
Joined: May 26, 2008

Ka-56 Portable Helicopter

Post by moonjee06 » Feb 08, 2009 Views: 11109

Ka-56 Portable Helicopter

In 1971 the Kamov Design Bureau was ordered to produce the new ultralight helicopter for military service. Sergei Fomin, Deputy Chief Designer, was ordered to lead this project.

The special task for this helicopter was that it should have been transported in a cylindrical container of 500mm diameter. The reason was that the Navy wished to have an opportunity to pull the helicopter out of a submarine’s torpedo tub



Another point was that the helicopter should have been assembled for flying in 15 minutes when unpacked from a container.

Powerplant was 40hp air-cooled rotary engine which burned motor-car fuel.

The full-scaled mockup was built first in order to find better decisions in helicopter’s configuration: to make it compact and easy to assemble. The next step was to build the test platform which included the real engine, rotor system, transmission and controls.




The only parts which were detachable from the helicopter for transportation were 4 main rotor blades. All other parts were easily folded. The time to assemble the helicopter was only 10 minutes.

Unfortunately Ka-56 wasn’t ever flown due to a lack of suitable rotary piston engine.




I LOVE S




User avatar
ujala
Ultimate Contributor
Ultimate Contributor
Posts: 18532
Joined: Jan 31, 2009
Location: Islamabad
Contact:

Post by ujala » Feb 08, 2009

superbbbbbbbbbbbbbbbbbbbb ..............

editorawais
Ultimate Contributor
Ultimate Contributor
Posts: 3700
Joined: Nov 15, 2008
Location: Buzy!!!

Post by editorawais » Feb 08, 2009

Very..........Nice

Post Reply

Return to “IT, Science & Technology News”